Construction Traffic Updates for November 2022

Construction Traffic Updates for November 2022

Reminders

MLK Blvd and Congress Avenue Lane Closures: One of the eastbound lanes of MLK Blvd from Colorado to Brazos Street (in front of the Bullock and Blanton Museums) is still closed to traffic.

MLK Blvd & Red River Lane Closures: Expect Lane closures on MLK Blvd between San Jacinto and Red River, as construction work on the realignment of Red River Street nears completion. Please drive carefully in this area.

Construction Gate at Brazos and 18th Street: The construction gate at Brazos and 18th Street has been shifting as the construction team paves this area. Please drive slowly in this area as you access the William B. Travis State Office Building, ERS building or Garage R.

Construction Zone Exits at 17th and 16th Streets Between Brazos and San Jacinto: Drive slowly in this area, as the construction area changes daily as sections of the road are completed. Watch out for heavy construction equipment and vehicles entering and exiting the construction zone onto San Jacinto from the 17th and 16th construction exits. (17th Street: near Scholz Garten, Garage R and the LBJ Building); 16th Street at Garage P.)

Visitors to Scholz Garten (San Jacinto and 17th Street): Watch out for construction vehicles exiting the construction zone traveling east on 17th Street – and use the sidewalk along the Central Services Building to travel between San Jacinto and Trinity.

Follow us on Twitter for specific details on street closures. @TFCtx

Share this post